Microsoft Dynamics 365 Blog

Published
1 min read

“Locked for rescheduling” and implications on Capacity reservation reductions 

This article will describe the interaction between Capacity reservations when you use the ‘Locked for rescheduling’ function in the Microsoft Dynamics AX 2012 Production Control module. Assume that you have the following scenario: Finished good item FG. Component item COMP. Finished good item FG has a BOM configured where the COMP Item is a component. Finished

Published
4 min read

Customizing the Bank reconciliation report to filter currency revaluation transactions 

Hello, When the Foreign currency revaluation process is run, Dynamics AX adjusts the amounts in the General Ledger accounts to recognize possible differences between the exchange rate for the original transaction currency, and the exchange rate that is used during the conversion to the accounting currency. As per the current design, Bank accounts are not